TGTGInsighttelegram intelligenceLIVE / telegram public index
Post content
Post content
We finished the end walls of the green house today. I installed extra corner brackets on all the 2" square tubing joints. Sorry , no pictures today. We also peeled all the protective plastic off the coroplast doors and hung four doors. And the last thing was installing some catches to stop the doors from sliding off the end of the tracks. Tomorrow we will install the corrugated poly on the end walls and hopefully the flashing trim and wiggle wire tracks.