TGTGInsighttelegram intelligenceLIVE / telegram public index
← 推个鸡场|优质小而美机场推荐

TGINSIGHT SIMILAR POSTS

查找相似内容

Source channel @pushgoodcloud · Post #607 · 11月30日

#Lantau#大屿山 之前购买过的,可以联系 @ljfxz 退款,直接发机场邮箱给他 剩余价值退款按照( 剩余时长*时长单价)+(剩余流量*流量单价)的形式退款 流量单价=套餐价格*0.8/套餐流量总数 时长单价=套餐价格*0.2/套餐时长总数 例如轻量套餐价格为9元,流量为80G,时长为30天。那天数单价为(0.2*9)/30,流量单价为(0.8*9)/80。 此时轻量用户还剩10天,流量还有70G,那退款为10*[(0.2*9)/30] + 70*[(0.8*9)/80] 注* 充了流量的钱也可退

Results

找到 1 条相似帖子

搜索 #eep

当前筛选 #eep清除筛选
Addis Standard

@addisstandardeng · Post #21595 · 2026/03/03 15:29

Grand #Ethiopian Renaissance Dam: how #Africa’s largest hydropower project Is powering #Ethiopia’s future A detailed examination of the Grand Ethiopian Renaissance Dam – its construction, specifications, commissioning, regional impact, and remaining challenges. The Grand Ethiopian Renaissance Dam (#GERD) is the largest hydropower project in Africa. Located on the #Blue_Nile in Ethiopia’s #Benishangul-Gumuz region, about 14km from the Sudanese border, the project has been delivered by Ethiopian Electric Power (#EEP) with major civil works undertaken by #Webuild Group (formerly #Salini Impregilo). The objective of the dam is to increase Ethiopia’s electricity generation capacity, reduce dependence on imported energy, and support long-term industrial and economic development. Construction began in 2011, and Ethiopia officially inaugurated...... Read more: https://www.waterpowermagazine.com/analysis/grand-ethiopian-renaissance-dam-how-africas-largest-hydropower-project-is-powering-ethiopias-future/?cf-view